23/04/2024 | Fulltime | Birmingham | CV-LibraryTo design and build the route, ready for tracks and signalling to be installed. Our work with HS2 Balfour Beatty VINCI have been awarded a 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and then on to Handsacre in Staffordshire. Overall, we will be building
Save for laterRegister your CV23/04/2024 | Fulltime | Stafford | CV-Library | £11 - £16 / Hour To install towbar systems including the connection of the tow socket to the OEM wiring system To carry out and document periodic inspection on company vehicles To conduct road tests for diagnostic and QC purposes (driving licence category dependent) To service and install hydraulic levelling systems
Save for laterRegister your CV22/04/2024 | Fulltime | Stockton-on-Tees, Billingham | CV-Library | £50,000 - £65,000 / Year Machinery and people. Lay down areas and offloading points. - Pre-plan the usage of key assets such as hoists to ensure planned assets meet the needs of the program. - Oversee the installation of site accommodation and manage these facilities. - Organise site inductions, ensure induction records
Save for laterRegister your CV22/04/2024 | Fulltime | King's Lynn | CV-LibraryCode using commercial (e.g. Straton, RSLogix) and proprietary applications. · Functional testing of configured hardware at works. · ‘Top-end’ support of outstation installation and commissioning. · Carrying out periodic quality checks of data from newly-installed outstations. · Creating/updating
Save for laterRegister your CV22/04/2024 | Fulltime | Tyne and Wear | CV-Library | £52,000 - £62,000 / Year Managing a team of Installation/Maintenance Engineers within an Infrastructure environment (Rail/Communications/Civils/Electrical) Experience of delivering planned Asset renewals of Engineering Infrastructure Health and Safety Certification/Qualification (IOSH/NEBOSH or equivalent) Prior experience
Save for laterRegister your CV19/04/2024 | Fulltime | Birmingham | CV-LibraryThe route, ready for tracks and signalling to be installed. Our work with HS2 Balfour Beatty VINCI have been awarded a 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and then on to Handsacre in Staffordshire. Overall, we will be building the following across
Save for laterRegister your CV19/04/2024 | Fulltime | Birmingham | CV-LibraryStarted working together over 30 years ago to deliver the Channel Tunnel, as members of the TransManche Link consortium. In the Midlands, it is Balfour Beatty VINCI’s role to design and build the route, ready for tracks and signalling to be installed. Our work with HS2 Balfour Beatty VINCI have been
Save for laterRegister your CV19/04/2024 | Fulltime | Carlisle | CV-LibraryTrainee Traffic Installation Technician If successful in this role, you will learn to install traffic signals, including the installation of ancillary and associated equipment and highways systems. Working from our Carlisle Depot this role will predominantly cover Cumbria, parts of Lancashire
Save for laterRegister your CV19/04/2024 | Fulltime | Birmingham | CV-LibraryTo be installed. Our work with HS2 Balfour Beatty VINCI have been awarded a 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and then on to Handsacre in Staffordshire. Overall, we will be building the following across all our sites •9.3km of viaducts •62
Save for laterRegister your CV19/04/2024 | Fulltime | Aldershot | CV-Library | £32,000 - £38,000 / Year Crestron, Extron, and Cisco systems. Technical proficiency in audiovisual signal processing and troubleshooting. Excellent communication and client-facing skills. Willingness to travel within the UK for project installations. Industry certifications (e.g., CTS, CTS-D) are a plus. Why Join Them Salary
Save for laterRegister your CVDon't you miss a job ever again!
Subscribe to all Signal Installer jobs in the United Kingdom.