30/05/2024 | Fulltime | Coleshill | CV-LibraryApproximately 90km from Long Itchington in Warwickshire to the centre of Birmingham and on to Handsacre in Staffordshire. We will be employing thousands of people in the area to design and build the civil infrastructure for HS2 through the West Midlands area and are looking for a wide range of experts to join
Save for laterRegister your CV30/05/2024 | Fulltime | Coleshill | CV-Library | £38,000 - £40,000 / Year The DVSA/DVA booking system. • Ensure all vehicles worked upon are handled carefully and that all precautions are taken in line with health & safety requirements. • Work within the confines of a tight contract/budget and maximize external labour and parts sales. • Closely monitor labour and parts sales
Save for laterRegister your CV30/05/2024 | Fulltime | Coleshill | CV-LibrarySectors in the UK and beyond. Our work with HS2 Balfour Beatty VINCI have been awarded a 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and on to Handsacre in Staffordshire. Overall, we will be building the following across all our sites • 42 viaducts
Save for laterRegister your CV30/05/2024 | Fulltime | Birmingham | CV-LibraryFor designing and building part of the most exciting and challenging railway project in Europe HS2. We are building the West Midlands section of HS2’s Phase One route, spanning approximately 80km from Long Itchington in Warwickshire to the centre of Birmingham and onto Handsacre in Staffordshire. We
Save for laterRegister your CV30/05/2024 | Fulltime | Birmingham | CV-LibraryBeatty VINCI’s role to design and build the route, ready for tracks and signalling to be installed. Our work with HS2 Balfour Beatty VINCI have been awarded a 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and then on to Handsacre in Staffordshire
Save for laterRegister your CV30/05/2024 | Fulltime | Coleshill | CV-LibraryA 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and then on to Handsacre in Staffordshire. Overall, we will be building the following across all our sites • 9.3km of viaducts • 62 overbridges • 35 cuttings • 56 culverts • 62 embankments • 2 twin bore
Save for laterRegister your CV30/05/2024 | Fulltime | Birmingham | CV-LibraryWith HS2 Balfour Beatty VINCI have been awarded a 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and then on to Handsacre in Staffordshire. Overall, we will be building the following across all our sites • 9.3km of viaducts • 62 overbridges • 35 cuttings
Save for laterRegister your CV30/05/2024 | Fulltime | Birmingham | CV-LibraryAnd on to Handsacre in Staffordshire. Overall, we will be building the following across all our sites •42 viaducts totalling over 11km •66 overbridges •More than 35 cuttings reaching over 30km •56 culverts •66 embankments reaching over 33km •Building four motorway crossings requiring box structures •Six interfaces
Save for laterRegister your CV29/05/2024 | Fulltime | Water Orton | CV-LibraryAnd then on to Handsacre in Staffordshire. Overall, we will be building the following across all our sites • 9.3km of viaducts • 62 overbridges • 35 cuttings • 56 culverts • 62 embankments • 2 twin bore tunnels and 2 cut and cover tunnels • 28 underbridges and 11 underpasses Diversity and Inclusion Balfour Beatty VINCI
Save for laterRegister your CV29/05/2024 | Fulltime | Coleshill | CV-Library | £25,000 - £30,000 / Year Are you ready to kick-start your finance career with hands-on experience in a dynamic business environment? Do you have a passion for data analysis and financial accuracy? Are you eager to develop your skills in a supportive finance team with clear progression routes? We are delighted to be working
Save for laterRegister your CV