25/04/2024 | Fulltime | Crewe | CV-LibraryLevel interconnects, with the EE Wiring team), Surface models (i.e. ensure any features on the A-surface are both shown in physical and virtual properties by the Design Dept, and that feasibility exists on the mounting and space requirements under the B-surface), Supplier liaison, BoM management
Save for laterRegister your CV18/04/2024 | Fulltime | Crewe | CV-Library | £40 / Hour And that feasibility exists on the mounting and space requirements under the B-surface) Supplier liaison BoM management and Design release (B-release) (Note detailed designs/models/drawings are typically done by the suppliers) Validation requirements and coordination General project management and cross functional
Save for laterRegister your CV18/04/2024 | Fulltime | Crewe | CV-Library | £40 / Hour And that feasibility exists on the mounting and space requirements under the B-surface) Supplier liaison BoM management and Design release (B-release) (Note detailed designs/models/drawings are typically done by the suppliers) Validation requirements and coordination General project management and cross functional
Save for laterRegister your CV25/04/2024 | Fulltime | Crewe | Apex Recruitment Services | Diagrams (system level interconnects, with the EE Wiring team), - Surface models (i.e. ensure any features on the Asurface are both shown in physical and virtual properties by the Design Dept, and that feasibility exists on the mounting and space requirements under the Bsurface), - Supplier liaison
Save for later