Top Job | 24/09/2024 | Fulltime | Selby | Totaljobs 12 pcBuilding a sustainable tomorrow Eastern Green Link 2 (EGL2) project is a 5-year project which will see the creation of a 525kV, 2GW high voltage direct current (HVDC) subsea transmission cable from Peterhead in Scotland to Drax in England. This will be the longest HVDC Cable in the UK and the UKs si
Save for later