19/06/2024 | Fulltime | Birmingham | CV-LibraryBeatty VINCI’s role to design and build the route, ready for tracks and signalling to be installed. Our work with HS2 Balfour Beatty VINCI have been awarded a 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and then on to Handsacre in Staffordshire
Save for laterRegister your CV07/06/2024 | Fulltime | St Martin (Guernsey) | CV-Library | £75,000 - £81,160 / Year In Warwickshire to the centre of Birmingham and to Handsacre in Staffordshire. Senior Environmental Manager will be responsible for leading the Main Works Civils Contract BBV, assuring that design and construction within the team is in accordance with organisational and sponsor requirements and policies
Save for laterRegister your CV06/06/2024 | Fulltime | Coleshill | CV-LibraryOf the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and then on to Handsacre in Staffordshire. Overall, we will be building the following across all our sites • 9.3km of viaducts • 62 overbridges • 35 cuttings • 56 culverts • 62 embankments • 2 twin bore tunnels and 2 cut
Save for laterRegister your CV06/06/2024 | Fulltime | Coleshill | CV-LibraryWith HS2 Balfour Beatty VINCI have been awarded a 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and then on to Handsacre in Staffordshire. Overall, we will be building the following across all our sites • 9.3km of viaducts • 62 overbridges • 35 cuttings
Save for laterRegister your CV05/06/2024 | Fulltime | Birmingham | CV-LibraryTo be installed. Our work with HS2 Balfour Beatty VINCI have been awarded a 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and then on to Handsacre in Staffordshire. Overall, we will be building the following across all our sites • 9.3km of viaducts • 62
Save for laterRegister your CV30/05/2024 | Fulltime | Birmingham | CV-LibrarySignificant infrastructures; creating unrivalled expertise and capability across rail, highways and aviation sectors in the UK and beyond. Our work with HS2 Balfour Beatty VINCI have been awarded a 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham
Save for laterRegister your CV29/05/2024 | Fulltime | Coleshill | CV-Library | £25,000 - £30,000 / Year To ensure accurate recording of costs to the correct cost centre in a timely manner. Carrying out clear and accurate balance sheet reconciliations during month-end process. Supporting the production of monthly packs. Analysing expenditure to provide insights to the business. Business partnering
Save for laterRegister your CVDon't you miss a job ever again!
Subscribe to all Data Centre Manager jobs in Coleshill.