11/06/2024 | Fulltime | Water Orton | CV-LibrarySuch as Highways Authorities, Network Rail, Statutory Undertakers. - Acceptance of the design by internal checkers and reviewers (including CAT 2 checks and other BBV departments). Acceptance of the design by CAT3 checkers. - Work in accordance with the BBV Design Management Plan and the Basis of Design documents
Save for laterRegister your CV