Top Job | 28/05/2024 | Fulltime | Norwich | MurphyBy 2050. The project is located over 60km in Norfolk, from Happisburgh to Necton, with installation of approx. 360km of power cables and over 5km of horizontal direction drilling. The project spans from 2023 to 2028, providing a fantastic, once in a generational opportunity for the successful candidate
Save for later