16/04/2024 | Fulltime | Bridgwater | CV-Library | At Hinkley Point C with cooling water and then discharge it back into the Bristol Channel. Our experts will use state-of-the-art technology to excavate a total of nine kilometres of tunnel, which will be lined with 38,000 concrete segments forming 6000 lining rings. The tunnels will be connected
Save for laterRegister your CV04/04/2024 | Fulltime | Bridgwater | CV-Library | Will use state-of-the-art technology to excavate a total of nine kilometres of tunnel, which will be lined with 38,000 concrete segments forming 6000 lining rings. The tunnels will be connected to the seabed by vertical shafts and capped with large intake and outfall heads, each weighing close to 5000
Save for laterRegister your CV