15/03/2024 | Fulltime | Golborne | CV-LibraryManagers - Site Supervisors. Review plant, labour and materials to ensure resources are in place for the short to medium term (1-3 months). Liaise with the Senior Project Manager to resolve any technical issues and ensure works are carried out in accordance with the Specification. To comply with company
Save for laterRegister your CV13/03/2024 | Fulltime | Golborne | CV-LibraryProject Delivery Engineer will be responsible for managing a projects engineering and technical aspects. Including coordinating with various teams, managing technical works schedules, ensuring adherence to quality standards and providing technical guidance to team members. The individual
Save for laterRegister your CV13/03/2024 | Fulltime | Golborne | CV-LibraryProject Delivery Engineer will be responsible for managing a projects engineering and technical aspects. Including coordinating with various teams, managing technical works schedules, ensuring adherence to quality standards and providing technical guidance to team members. The individual
Save for laterRegister your CV10/03/2024 | Fulltime | Golborne | CV-LibraryOf constructability and permanent works in relation to Temporary Works. Own and manage the Design Change process on projects. Own and manage Technical Query process upstream to clients and external stakeholders and downstream with suppliers and consultants. Manage design co-ordinators on the project and within
Save for laterRegister your CV07/03/2024 | Fulltime | Golborne | CV-LibraryPipeline routing design in coordination with the geospatial team Lead design risk assessments Authoring, checking and approving of technical design reports, Project reporting and coordination of design activities within the engineering team Represent the design department, when necessary, at internal
Save for laterRegister your CV07/03/2024 | Fulltime | Golborne | CV-LibraryFitter Excellent troubleshooting ability, technical knowledge of Plant and Equipment Possess extensive knowledge of current practices and methods in the plant industry
Save for laterRegister your CV29/02/2024 | Fulltime | Golborne | CV-LibraryOf the proposed track construction methodology and design. Resolving technical problems at all levels and following up with TQs. Accurate setting out of track works and dimensional control, for example, ballast levels, ballast ramp extents, weld positions and tamping limits. The production of survey information
Save for laterRegister your CV