Top Job | 23/04/2024 | Fulltime | Bridgwater | Mactech Energy GroupHPC). HPC has constructed a 500m long state-of-the-art temporary jetty within the Bristol channel. The jetty operates based on construction demands as well as the demands of the environment, sitting within the 3rd highest tidal range in the world. The Harbour Master is the key individual to ensure
Save for later