Top Job | 17/04/2024 | Fulltime | Cambridge | NES FircroftPlantroom is located on level 02 and consists of 2No. Heat Pumps and associated pipework circuits connected to the ground loop via the main manifold. To date significant installation works and commissioning have been carried out and SES are entering the completion phase of the GSES. The project is being
Save for later