15/04/2024 | Fulltime | Wotton-under-Edge | CV-LibraryThe analysis of budget v actual cost. Work with Supply Chain and Engineering to identify cost reduction opportunities. Manage the maintenance of the project Bill of Materials from kick-off to delivery. The Materials Controller will have MCIPS (or working towards) with a minimum of 3-5 years working
Save for laterRegister your CV15/04/2024 | Fulltime | Wotton-under-Edge | CV-LibraryEquipment in area of assignment as required. Maintain quality standards by inspecting and testing finished products to ensure conformance with specifications and codes. The Electrical Technician will have Either a recognised qualification (apprenticeship, HNC/HND or degree level) in Engineering
Save for laterRegister your CVDon't you miss a job ever again!
Subscribe to all Project Engineer jobs in Wotton Under Edge.