23/04/2024 | Fulltime | Bridgwater | Mactech Energy GroupHarbour Master Long term contract Hinkley Point C, Somerset All inclusive day rate of up to £360 (via Umbrella) Hinkley Point C (is a statutory harbour authority, set up specifically to facilitate the import of materials to be used in the construction of the Hinkley Point C Nuclear Power Station
Save for later23/04/2024 | Fulltime | Bridgwater | Mactech Energy GroupReactors, the first in a new generation of nuclear power stations in the UK providing low-carbon electricity for around six million homes. The Area Integration Engineer will develop a recommended sequence of installation of all scope across multiple contracts within their designated area; from
Save for later23/04/2024 | Fulltime | Bridgwater | Bridgwater & Taunton College | £41,981 Assessment, and curriculum development. This particular role is required for Bridgwater & Taunton College to fulfil the growing skills demand in order to meet local and national workforce requirements, for current and future civils projects such as Hinkley Point C power station. We welcome applications from
Save for later28/03/2024 | Fulltime | Bridgwater | Totaljobs 12 pcnuclear reactors, the first in a new generation of nuclear power stations in the UK providing low-carbon electr
Save for later25/03/2024 | Fulltime | Bridgwater | Totaljobs 12 pcHarbour Master Long term contract Hinkley Point C, Somerset All inclusive day rate of up to £360 (via Umbrella) Hinkley Point C (is a statutory harbour authority, set up specifically to facilitate the import of materials to be used in the construction of the Hinkley Point C Nuclear Power Station
Save for later22/04/2024 | Fulltime | Bridgwater | CV-Library | About the role Amazing infrastructure isn’t the only thing that gets built here. Incredible careers do too. Join our Balfour Beatty Kilpatrick team as a CAD Engineer (EC&I) on Hinkley Point and you can build something to be proud of here. About Hinkley Point C The first new nuclear power station
Save for laterRegister your CV18/04/2024 | Fulltime | Bridgwater | CV-Library | £40,000 - £45,000 / Year Project Coordinator to join our client, a leading international infrastructure group who will be working on the first new nuclear power station to be built in the UK in over 20 years. Hinkley Point C in Somerset will provide low-carbon electricity for around 6 million homes, create thousands
Save for laterRegister your CV18/04/2024 | Fulltime | Bridgwater | CV-Library | £42,000 - £52,000 / Year Abatec are currently recruiting for an experienced Construction Engineer to join our client, a leading international infrastructure group who will be working on the first new nuclear power station to be built in the UK in over 20 years. Hinkley Point C in Somerset will provide low-carbon
Save for laterRegister your CV18/04/2024 | Fulltime | Bridgwater | CV-Library | £40,000 - £45,000 / Year Project Coordinator to join our client, a leading international infrastructure group who will be working on the first new nuclear power station to be built in the UK in over 20 years. Hinkley Point C in Somerset will provide low-carbon electricity for around 6 million homes, create thousands
Save for laterRegister your CV17/04/2024 | Fulltime | Bridgwater | CV-LibraryIn helping to support their key client on Hinkley Point C. Your duties and responsibilities will be Nuclear Power Programmes are delivering client critical works to some of our major UK and European Projects. Our embedded teams are delivering support to Hinkley Point C (New build power station in the South
Save for laterRegister your CVDon't you miss a job ever again!
Subscribe to all Nuclear Power Station jobs in Somerset County.