17/04/2024 | Fulltime | Bridgwater | CV-Library | £130 Operational & Project KPI reporting are supported. The key task will be to maintain an accurate dashboard in addition to managing JDO day-to-day Change Object tracking and supporting the JDO configuration team's reporting from the new HPC Plant Life Management Tool. Responsibilities Extract and publish daily
Save for laterRegister your CV15/04/2024 | Fulltime | Bridgwater | CV-LibraryBouygues Energies & Services has a fantastic opportunity available for an M&E & Welding Site Supervisor - Black Hat to be based from the Hinkley Point C site in Bridgwater. We have been awarded a Turn-key EPC contract for the Hinkley Point C (HPC) new-build nuclear power plant Emergency Diesel
Save for laterRegister your CV15/04/2024 | Fulltime | Bridgwater | CV-Library | £45,000 - £60,000 / Year Engineer, at our Bridgwater site. The Role As a Site Maintenance Engineer, you'll have a role that's out of the ordinary. Supporting the Hinkley Point C (HPC) Nuclear Power Plant to be constructed, commissioned, operated safely and effectively within the UK regulatory framework. Day-to-day, you'll
Save for laterRegister your CV11/04/2024 | Fulltime | Bridgwater | CV-Library | £350 - £400 IT literate with a strong understanding of quality documentation and procedures? We are recruiting for a Field Engineer, who will Carry out Surveillance on construction activities performed by a Contractor on a Nuclear Power Plant Construction Site. The Activities is relating to the Construction
Save for laterRegister your CV05/04/2024 | Fulltime | Bridgwater | CV-LibraryQuantity Surveyor to be based from the Hinkley Point C site in Bridgwater. Our team are currently working on the backup power plant and Emergency Diesel Generators (EDG) at the incredible Hinkley Point C (HPC) Nuclear Power Station project and we are now also in the bid phase for Sizewell C (SZC
Save for laterRegister your CV04/04/2024 | Fulltime | Bridgwater | CV-Library | To support the construction of the first new nuclear power station built in the UK in a generation. The project will see the construction of three tunnels under the seabed that will supply the two reactors at Hinkley Point C with cooling water and then discharge it back into the Bristol Channel. Our experts
Save for laterRegister your CVDon't you miss a job ever again!
Subscribe to all Nuclear Power Plant jobs in Bridgwater.