Top Job | 17/04/2024 | Fulltime | Cambridge | NES FircroftHeader pipework from 6No. submanifolds to a main manifold. The main manifold is connected to two plantrooms SFH and CUB4 situated in two separate buildings. CUB4 is the larger of the two plantrooms, located on Level 01, and comprises of 6No. Heat Pumps with associated circulation pumps and Heat Meters
Save for later