18/04/2024 | Fulltime | Birmingham | CV-LibraryIn the Midlands, it is Balfour Beatty VINCI’s role to design and build the route, ready for tracks and signalling to be installed. Our work with HS2 Balfour Beatty VINCI have been awarded a 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and then on to Handsacre
Save for laterRegister your CV18/04/2024 | Fulltime | Birmingham | CV-LibraryTo the centre of Birmingham and then on to Handsacre in Staffordshire. Overall, we will be building the following across all our sites • 9.3km of viaducts • 62 overbridges • 35 cuttings • 56 culverts • 62 embankments • 2 twin bore tunnels and 2 cut and cover tunnels • 28 underbridges and 11 underpasses
Save for laterRegister your CV18/04/2024 | Fulltime | Coleshill | CV-LibraryData Analyst (Finance) Location/Hybrid Birmingham/3 days on site a week, 2 day working from home Contract length 6 months IR35 Status Inside IR35 Overview Balfour Beatty is a leading international infrastructure group with over 25000 employees worldwide They provide their clients
Save for laterRegister your CV17/04/2024 | Fulltime | CV-LibraryHubs, show homes and marketing suites is maintained to the necessary standard. Work with the construction and customer care teams to ensure plots are completed to an acceptable standard prior to handing over to the customer and that proper customer service is provided after handover. Monitor
Save for laterRegister your CV12/04/2024 | Fulltime | Coleshill | CV-LibraryAn exciting opportunity for an experienced Technical Support Advisor to join our Established Customer Support team here at our Head office in Coleshill. Main Responsibilities of the role Handle and resolve all inbound and outbound technical issues from installers and customers usually via the telephone
Save for laterRegister your CV05/04/2024 | Fulltime | Birmingham | CV-LibraryHave been awarded a 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and then on to Handsacre in Staffordshire. Overall, we will be building the following across all our sites • 9.3km of viaducts • 62 overbridges • 35 cuttings • 56 culverts • 62
Save for laterRegister your CV05/04/2024 | Fulltime | St Martin (Guernsey) | CV-LibraryIt is Balfour Beatty VINCI’s role to design and build the route, ready for tracks and signalling to be installed. Our work with HS2 Balfour Beatty VINCI have been awarded a 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and then on to Handsacre in Staffordshire
Save for laterRegister your CV05/04/2024 | Fulltime | Birmingham | CV-LibraryVINCI’s role to design and build the route, ready for tracks and signalling to be installed. Our work with HS2 Balfour Beatty VINCI have been awarded a 90km section of the HS2 project from Long Itchington in Warwickshire to the centre of Birmingham and then on to Handsacre in Staffordshire. Overall, we
Save for laterRegister your CV05/04/2024 | Fulltime | Coleshill | CV-LibrarySales forecasts. Strong in objection handing and getting through to the decision maker. Excellent customer service skills - both written and verbal Strong rapport building skills. A confident communicator, and able to build relationships at all levels. Good attention to detail - making sure all calls
Save for laterRegister your CV05/04/2024 | Fulltime | Coleshill | CV-LibraryPlanning Strong knowledge of Supply Chain processes Knowledge of Power BI Great communication skills and ability to have a tailored approach with Production as well as to Sales Great ability to move from a global vision to a detailed vision Great ability to lead and implement change Leadership, influence
Save for laterRegister your CV